Rigging a pitch for group Abseil and/or ladder

Latest Comments

Use a shorter length of rope to rig the traverse line with a Y hang at the end. Make sure your Y hang is as high as possible. Note the knots, bowling at the start of the pitch, alpine butterfly’s at the traverse line anchors, alpine butterfly at the first bolt of the Y hang, followed by 2 figure of eights. Each knot tightens in use, rather than distorting.


Tags:

Leave a Reply